Malathouna – Xerovouni Wind Park

Road Design Studies and participation in construction of  “Malathouna – Xerovouni wind Parks” Project.

New Ways Development Works:
Land Surveying
Road Design Study
Preliminary & Detailed Design

Small Hydroelectric Plant “Evinos”

The project refers to the construction and operation of a Small Hydroelectric Project with a diversion Dam on the Evinos River. It is located 4.5 km southeast of Makrynou settlement. The small hydroelectric plant (nominal power 9.60 MW) uses part of the Evinos river runoff, and is constructed for the purpose of producing hydroelectric power that will feed the PPC network.

New Ways Development Works:
Land Surveying
Cadastre
Preliminary & Detailed Design
Environmental Impact Assessments