Kafireas Wind Park

Participation in the construction of the 154 MW wind farm located in the southern part of Evia, a mainly mountainous island in the Aegean Sea, which offers also vast fertile plains suitable for cultivation and breeding of oxen and sheep.

The wind farm is going to be equipped with a high-voltage (150kV) interconnection line to the continental network, including aerial, underwater, and subterranean cables. The plant’s annual production capacity will amount to approximately 483 GWh, meeting the annual energy needs of around 129 thousand Greece households and avoiding at the same time each year the emission of 433 thousand tons of CO2”.

New Ways Development Works:
Land Surveying
Preliminary Alignment Design

Faliron Tae Kwon Do Stadium

The Faliro Olympic Indoor Hall is yet another of the Olympic facilities, and it was built in order to cover the needs of the Olympic Games of Athens and hosted the sports of Tae Kwon Do and Handball. The area of the arena and the tiers is changeable and this makes it easy to house many, different activities.

New Ways Development Works:
Land Surveying
Detailed Building Footprint