“Eschatia” Stream Settlement

Participation in theĀ “Eschatia” streambed Project, which concerns the broadening of the streambed , the construction of a twin enclosed rectangular reinforced concrete culvert with dimensions (2×5.0x5.0m) and its backfilling along the length of 3km.

New Ways Development Works:
Land Surveying
Road Design Study
Detailed Alignment Design

“Afidnai” Toll Station Project

Participation in the construction of infrastructure works for the “Afidnai” toll station Project

New Ways Development Works:
Land Surveying
Detailed Design