TAP Gas Pipeline

TAP Gas Pipeline

scopeTransport Caspian natural gas to Europe

Connecting with the Trans Anatolian Pipeline (TANAP) at the Greek-Turkish border, Trans Adriatic Pipeline (TAP) will cross Northern Greece, Albania and the Adriatic Sea before coming ashore in Southern Italy to connect to the Italian natural gas network.

The project is currently in its construction phase, which started in 2016.

Once built, TAP will offer a direct and cost-effective transportation route opening up the vital Southern Gas Corridor, a 3500-kilometre long gas value chain stretching from the Caspian Sea to Europe.

New Ways Development Works:
Preliminary & Detailed Alignment Design
Preliminary & Detailed Drainage Design
Land Surveying